TM 10-5410-228-10
Table 2-1. Operator Preventive Maintenance Checks and Services for CBPS - Continued
B - BEFORE D - DURING A - AFTER H - HOURLY
Location
Item
Item to
Not Fully Mission
No.
Interval
Check/Service
Procedure
Capable If:
ECV - under hood
66
B
Belt
Check belt for proper
Improper operation.
operation.
67
B
Primary hydraulic
Check pump for leaks.
Class II leak: refer to
pump
para 2.20.
68
B
Primary hydraulic
Check for leaks.
Class II leak, refer to
para 2.20.
pump hoses and
fittings
Ensure EPG system functions EPG system does not
69
B
EPG system
function properly.
properly, controlling ECV
engine speed at 1,400 to 1,500
rpm.
To prevent injury to personnel, use care when walking around ABS stakes and anchor lines.
70, sheet 9
B
ABS fabric
Check for rips, punctures, pin
Rips, punctures, pin
holes, loose stitches and
holes and separated
separated seams. Repair per
seams that prevent
para 3.13.1.
proper operation.
71
B
Anchor lines and
Check for missing or damaged ABS unstable due to
slips
anchor lines and slips.
missing or damaged
lines or slips.
72
B
Stakes
Ensure there are at least 22
ABS unstable due to
serviceable stakes.
missing stakes.
Any tears or loose
73
B
Direct Complex
surfaces which prevent
Check fabric for holes, tears or
Sheltering (DCS)
normal operation.
rips. Check for missing airflow
Airflow strip missing.
strip. Check DCS connector
connector
fabric for holes, tears or rips.
Check zipper functions
properly.
74
B
DCS doorway flap
Unroll flap. Check flap for
tears. Ensure flap is secured to
ABS with fastener hook and
fastener loop tape. Check for
missing or damaged buckles.
75
B
Tie-down ring fabric Send to unit level maintenance
holders
for repair.
2-43