TM 3-6665-329-13&P
This task covers;
Removal.
a.
Installation.
b.
INITIAL SETUP
Tools:
Electronics equipment tool
kit TK-100/G
Materials/Parts: Cartridge fuse part No. FO2-A-250V-2A
Removal
a.
(1) Remove lid and panel assembly (para 3-11b steps 1 thru 8).
(2) Remove fuseholder cap (1) and remove fuse (2).
(3) Remove nut (3) and Iockwasher (4) and pull fuseholder (5) through panel assembly.
(4) Unsolder wires (6) from fuseholder (5).
(5) Remove Iockwasher (4) and nut (3) from wires.
Installation.
b.
(1) Slide nut (3) and Iockwasher (4) onto wires (6) and pull wires through panel assembly.
(2) Using FO-2 as a guide, soldler wires (6) to fuseholder (5).
(3) Install Iockwasher (4) and nut (3) on fuseholder (5).
(4) Install fuse (2) and fuseholdler cap (1).
(5) Install panel assembly and lid (para 3-11c steps 4 thru 8 and 20).
3-93