TM 3-6665-329-13&P
This task covers:
a.
Removal.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-100/G
a.
Removal.
(1)
Remove lid and panel assembly (para 3-11b steps 1 thru 8).
(2)
Unsolder wires from binding posts (1),
(3) Remove nut (2), Iockwasher (3), flat washer (4), and bottom insulator (5) from
binding post (1).
Remove binding post (1) and top insulator (6).
(4)
b.
Installation.
(1) Install binding post with top insulator (6) into front of panel and install bottom insulator
(5), flat washer (4), Iockwasher (3), and nut (2) on binding post.
(2) Solder wires to binding post (1).
(3) Install panel assembly and lid (para 3-11c steps 4 thru 8 and 20).
3-92