• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
NONMETALLIC TUBING ASSEMBLY. - Continued
NONMETALLIC TUBING ASSEMBLY. - Continued

M140 Chemical Agent Alarm \(Nsn 6665-01-083-2749\)
Page Navigation
  85    86    87    88    89  90  91    92    93    94    95  
img
. . .
TM 3-6665-329-13&P
NOTE
Following procedures are typical for both the PRESSURE and VACUUM TEST
nonmetallic tubing assemblies.
This task covers:
Removal
a.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-100/G
Materials/Parts: Front Ferrule Part No, 403-1-1 each
Back ferrule Part No. 404-1-1 each.
Removal
(1) Remove lid (para 3-11 b steps 1 thru 2).
(2) Unscrew screw (1) and open PNEUMATIC LINE STORAGE cover assembly (2).
(3) Unscrew nut (3) and remove nonmetallic tubing assembly (4).
(4) Cut nonmetallic tubing from metallic tube (5) and remove nut (3).
NOTE
Reuse nut and grommet.
(5) Check nut (3) for cracks or crossed threads.
3-69


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.