TM 3-6665-329-13&P
This task covers:
Removal.
a.
b.
Installation.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-100/G
Removal.
a.
(1) Remove lid and panel assembly (pare 3-11b steps 1 thru 8).
(2) Label and disconnect nonmetallic tubing assemblies from FLOW ADJUST
regulating valve (2).
(3) On front panel loosen setscrew (3).
(4) Remove knob (4)
(5) Remove sealing nut (5) and securing nut (6).
(6) Remove FLOW ADJUST regulating valve (2).
3-74