• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GROMMET - Continued
NONMETALLIC TUBING ASSEMBLY. - Continued

M140 Chemical Agent Alarm \(Nsn 6665-01-083-2749\)
Page Navigation
  83    84    85    86    87  88  89    90    91    92    93  
img
. .
TM 3-6665-329-13&P
NOTE
Following procedures are typical for all nonmetallic tubing assemblies except pressure
and vacuum test and flowmeter nonmetallic tubing assemblies.
This task covers:
a.
Removal.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-100/G
Equipment condition: Lid and panel assembly removed during troubleshooting.
Materials/Parts: Front ferrule Part No. 403-1-2 each
Back Ferrule Part No. 404-1-2 each
a.
Removal
NOTE
Do not remove the panel assembly to replace the nonmetallic tubing assembly
connected to the flow rate meter and the flowmeter bushing.
(1) Unscrew two nuts (1) and remove nonmetallic tubing assembly (2).
3-67


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.