TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
CONTROL PANEL (Continued)
Figure 2-17. Control Panel Alignment
e. Check control panel gages.
If the gages do not operate
correctly or are damaged
(2) Start engine according to engine startup proce-
(3) Pressure gage should read between 90 and 100
psi. If it does not, turn to operator troubleshooting in
(4) Temperature gage should read the same as the
outside temperature.
11
FLOWMETER
WARNING
flowmeter is damaged. Insecticide can leak into
vehicle and be hazardous to health.
2-14