TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
FORMULATION TANK (Continued)
Figure 2-20. Formulation Tank
(3) Check around valves and fittings for air or fluid
leaks. Notify your supervisor of any leaks or damaged
components.
c. Check tank pressure gage.
(1) Check gage for physical damage. Notify your
supervisor of any damage.
(2) When tank is pressurized, pressure gage should
read 10 to 15 psi.
2-17