TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
Figure 2-19. Hoses, Lines, and Fittings
12
HOSES, LINES, AND FITTINGS
Check all hoses, lines, and fittings for leaks, cracks, or
The hose lines or fittings
chafing. Notify your supervisor of any damaged hoses or
leak
fittings.
13
FORMULATION TANK
a. Make sure valves turn smoothly.
The formulation tank leaks
air or fluid
b. Check valves and fittings for leaks.
(2) Start engine according to engine startup proce-
2-16