TM 3-6665-329-13&P
This task covers:
Removal.
a.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
kit TK-105/G
Removal.
a.
(2) Unscrew screws (1) and raise flowrate meter (2) to vertical position.
(3) Remove nut (3), Iockwasher (4), spring washer (5), bracket (6), and shaft (7).
b.
Installation.
(1) Secure bracket (6) to flowrate meter assembly with shaft (7), spring washer (5),
Iockwasher (4) and nut (3).
(2) Lower flowrate meter and secure with screws (1).
3-80