ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
This task covers:
Removal.
a.
Installation.
b.
INITIAL SETUP
Tools:
Electronic equipment tool
Removal.
a.
(1) Remove lid and panel assembly (para 3-11b steps 1 thru 8).
(2) Remove five wires.
(3) Loosen two setscrews (1) and remove knob (2) from shaft of ALARM TEST switch (3).
(4) Remove nut (4) and Iockwasher (5).
(5) Remove rotary switch (3) from rear of panel assembly.
Change 2