TM 5-6635-386-12&PSECTION IVSAFETY PROCEDURESGENERAL4-1. PURPOSE.This section provides life cyclecontrols for the Campbell Pacific Nuclear Model MC-1Nuclear Method Tester, NSN 6635-01-0306896. Areas ofresponsibility are then identified and assigned forpersonnel involved in the life cycle program.4-2. SCOPE.These safety procedures apply toActive Army, US Army Reserve, Army National Guard,and all other installations, activities and units coveredunder the conditions of the Nuclear RegulatoryCommission (NRC) license issued to the US Army Tank-Automotive Command (TACOM). Areas of involvementinclude procurement, storage, possession, shipment,transfer, operation, use and disposition of the tester.4-3. LICENSE.NRC license number 21-01222-05has been issued to TACOM. This license authorizesTACOM to purchase, use, and store the tester.Conditions of the license permit the tester to be issuedthroughout the Army without specific licenses beingissued to individual users. The license also states howradioactive material shall be used to measure themoisture content and density of soils and asphalt. A copyof the license is furnished with each tester. Additionalcopies of the license may be obtained from theCommander, TACOM, ATTN: AMSTA-CZ.4-4. REGULATIONS. Refer to Appendix A forapplicable Army regulations (AR), technical bulletins (TB)and codes of Federal regulations.RESPONSIBILITY4-5. PROGRAM MANAGER. The Commander,TACOM, is the program manager. Areas of responsibilityare:a. Ensure compliance with Section IV of thismanual by monitoring reports of radiation leakage tests,incidents and equipment improvement. Utilize feedbackreports from logistic assistance teams, inspection teamsand reports from majorArmy command Radiation Material Control Points(RMCP).b. Maintain overall National Inventory ControlPoint (NICP) functions by managing the tester as a majoritem.c. Provide coordination for tester disposal inaccordance with AR 385-11.4-6. NICP ITEM MANAGER.Areas of responsibilityare:a. Account for each tester by serial number.b. Issue testers to specific units, based uponplans developed individually, or together, by the Chief ofEngineers and the Commander, TRADOC.c. Ensure that the consignee for the initial issueof the tester is the commander of the specific unit (see babove). Under no circumstances shall the consignee bethe Property Book Officer (PBO), Director of IndustrialOperations (DIO), or the Transportation Officer (TO).d. Ensure that all requests are channeledthrough the using units RMCP, and that the requestscontain certificates and appointing orders on the usingCommand Local Radiation Protection Officer (LRPO),Alternate LRPO and operator. The requests must alsocontain a proposed storage location drawing withbackground readings as per Section IV of TM 5-6635-386-12.e. Issue disposition instructions and coordinatedisposal action in accordance with AR 385-11.f. Request documentation from manufacturer oftesters received for overhaul or repair from user unit.g. Request documentation from manufacturer oftesters in transit to user units.4-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business