ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
This task covers:
Removal.
a.
Testing.
b.
Installation.
c.
INITIAL SETUP
Tools: Electronic equipment tool kit TK-105/G
Troubleshooting references: para 3-7.2
Equipment condition: Lid removed during functional testing.
Removal.
a.
(1)
Remove 21 screws (1), Iockwashers (2), and flatwashers (3).
(2) Unscrew two screws (4).
(3) Raise flowmeter (5) and lock in position with spring lock hinge (6).
(4) Place one hand into flowmeter opening and place fingers around right flowmeter bracket (7).
(5) Grasp binding posts (8) with other hand.
(6) Lift panel assembly (9) from test set case (10).
3-51
Change 2