• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PANEL ASSEMBLY. - Continued
SPRING TENSION CLIP.

M140 Chemical Agent Alarm \(Nsn 6665-01-083-2749\)
Page Navigation
  69    70    71    72    73  74  75    76    77    78    79  
img
. . . .
TM 3-6665-329-13&P
This task covers:
a.
Removal.
b.
Installation,
INITIAL SETUP
a.
Removal.
(1) Remove lid (para 3-11b steps 1 and 2).
(2) Push in and release three fasteners (1) and open accessory shelf (2).
(3) Unscrew screw (3).
(4) Remove screw (4), two washers (5), locknut (6) and clamp (7).
b.
Installation.
(1) Install screw (3) on accessory shelf (2).
(2) Position clamp (7) in mounting position. Secure screw (4), two washers (5) and locknut (6).
(3) Tighten screw (3),
(4) Install lid (para 3-11c steps 19 and 20).
3-53


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.