• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECTION IV OPERATOR'S MAINTENANCE INSTRUCTIONS
SECTION V ORGANIZATIONAL MAINTENANCE INSTRUCTIONS

Maintenance Manual Mechanism, Valve Replacement, M1
Page Navigation
  11    12    13    14    15  16  17    18    19    20    21  
img
. . . .
in the coupling chains. Test each adjustable
practice replacing the valve on a container filled with
chain coupling by turning the coupling hook
compressed air.
in and out of the coupling body. Replace
the chain if any links are damaged. Repair
e. After-Operation Services.
or replace the coupling hook if damaged.
(1) Decontamination.
If  the  M1  valve
(7) Container  gage  assembly.
Test  the
replacement mechanism is contaminated
container gage for flatness by putting it
with a liquid chemical agent, disassemble
against a flat surface. A bent gage may be
the equipment (pars. 26 through 30),
used temporarily if allowance is made for
decontaminate
(TM
3-220),
and
the error in measurement caused by a bent
reassemble.
part.  Replace the bent gage as soon as
possible.
(2) Correcting  Deficiencies.
Correct
any
deficiencies noticed during operation.
d. Trial Exercise.
Before using the M1 valve
replacement mechanism on a filled one-ton container,
(3) Lubrication. Lubricate the equipment (para.
21).
TAGO 5013-A 18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.