in the coupling chains. Test each adjustable
practice replacing the valve on a container filled with
chain coupling by turning the coupling hook
compressed air.
in and out of the coupling body. Replace
the chain if any links are damaged. Repair
e. After-Operation Services.
or replace the coupling hook if damaged.
(1) Decontamination.
If the M1 valve
(7) Container gage assembly.
Test the
replacement mechanism is contaminated
container gage for flatness by putting it
with a liquid chemical agent, disassemble
against a flat surface. A bent gage may be
used temporarily if allowance is made for
decontaminate
(TM
3-220),
and
the error in measurement caused by a bent
reassemble.
part. Replace the bent gage as soon as
possible.
(2) Correcting Deficiencies.
Correct
any
deficiencies noticed during operation.
d. Trial Exercise.
Before using the M1 valve
replacement mechanism on a filled one-ton container,
(3) Lubrication. Lubricate the equipment (para.
TAGO 5013-A 18