TM 3-4230-209-30&P
2-168
2- 33. LIQUID FUEL WATER HEATER AND CABINET TOP COVER (CONT).
REMARKS
ACTION
LOCATION/lTEM
REASSEMBLY (CONT)
Liquid Fuel Water Heater and
Cabinet Top Cover/
Slide shackle (55) into place and aline holes. Install bolt (56) and nut (57).
Shackle (55)
Tack weld nut (57) and bolt (56).
Bolt (56)
Nut (57)
Screws (59), washers (60), and nuts (61 ) may already
Position plate (58) onto cabinet frame (5) and aline holes. Install three
Plate (58)
be installed when control box was installed. If so, they
machine screws (59) through plate (58), cabinet frame (5), and top edge
Machine screws (59)
will be removed and reinstalled correctly.
of control box (9). Secure with three internal tooth lock washers (60) and
Internal tooth lock
hexagon plain nuts (61).
washers (60)
Hexagon plain nuts (61)
If new cabinet top cover is used, lineup upper and
Install five machine screws (62) across top and sides of plate (58). Secure
Machine screws (62)
lower clamping catches to drill holes.
with five internal tooth lock washers (63) and hexagon plain nuts (64).
internal tooth lock
washers (63)
Hexagon plain nuts (64)
Apply new decal (65) to inside surface of cabinet top cover (66).
Decal (65)
Cabinet top cover (66)
Position new clamping catches (67) over edge of cabinet top cover (66).
Clamping catches (67)
Install two solid rivets (68) through clamping catch and cabinet top cover
Solid rivets (68)
and secure.
Close cabinet top cover (66) and latch both clamping catches (67) to
make sure they match.