• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  164    165    166    167    168  169  170    171    172    173    174  
img
.
Pipe elbow (14)
Wrap antiseizing tape around external
threads of the pipe elbow (14) located at
the bottom of the boiler assembly (1).
Nonmetallic grommet (15)
Insert nonmetallic grommet (15) into
Quick disconnect coupling
hole in the skid assembly (2). Screw
half (16)
quick disconnect coupling half (16) onto
pipe elbow (14) and tighten.
Thermostatic switch (17)
Wrap antiseizing tape around the external threads of thermostatic
Electrical splice (18)
switch (17) before installing into top of boiler assembly (1).
Install thermostatic switch (17) into top of boiler assembly (1) and tighten.
Cut and strip electrical wire from thermostatic switch (17). Connect wires
to the electrical wiring with two electrical splices (18). (See pages 2-154
and 2-155.)
2-163
TM 3-4230-209-30&P


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.