• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
Install cover (44) onto the boiler assembly (1). Secure with three internal
Cover (44)
Internal tooth lock
tooth lock washers (45) and hexagon plain nuts (46) on the boiler unit
washers (45)
studs.
Hexagon plain nuts (46)
Internal tooth lock
Install three internal tooth lock washers (47) and machine screws (48).
washers (47)
Machine screws (48)
Internal tooth lock
Install one internal tooth lock washer (49) and machine screw (50).
washer (49)
Machine screw (50)
Clamping catch (51)
Position clamping catch (51 ) onto cabinet frame (5) upper edge, aline
Solid rivets (52)
holes. Install two solid rivets (52) to secure. Repeat for clamp catch on
other end of unit.
Identification plate (53)
Install identification plate (53), aline holes, and secure with four solid
Solid rivets (54)
rivets (54).
2-167
TM 3-4230-209-30&P


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.