• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued
LIQUID FUEL WATER HEATER AND CABINET TOP COVER. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  161    162    163    164    165  166  167    168    169    170    171  
img
TM 3-4230-209-30&P
2-160
2-33. LIQUID FUEL WATER HEATER AND CABINET TOP COVER (CONT).
REMARKS
ACTION
LOCATION/lTEM
Liquid Fuel Water Heater and
Cabinet Top Cover/
WARNING
During lifting operations of the boiler assembly (1), keep in
mind that the refractory box assembly end may have refrac-
tory castable mix installed. This adds greatly to the weight
at a rate of approximately 55 pounds per cubic foot. Make
allowances for the center of gravity.
Use a suitable lifting device to lift boiler assembly (1) onto skid
Boiler assembly (1)
assembly (2), and aline the eight mounting holes. Secure boiler
Skid assembly (2)
Internal tooth lock
assembly (1) with eight internal tooth Iock washers (3) and hexagon head
washers (3)
cap screws (4).
Hexagon head cap
screws (4)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.