• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TANK UNIT. - Continued
TANK UNIT. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  142    143    144    145    146  147  148    149    150    151    152  
img
Tank Unit/
Replace authorized unserviceable parts.
Paint over all yellow markings currently
on the tank unit. Repaint any chipped or
damaged areas with green
polyurethane coating.
Repaint the former yellow information
signs using black polyurethane coating
in accordance with measurements and
locations shown.
If new shackles are to be installed, tack-
weld the nut after the shackle is
attached.
Tank Unit/
Tank assembly (1)
Using two soldiers and a lifting device
Tank skid base (2)
with 1,000 pound capacity, position
Hexagon head cap
tank assembly (1) on tank skid base (2)
screws (3)
and aline bolt holes. Insert eight
Lock washers (4)
hexagon head cap screws (3) through
Hexagon plain nuts (5)
tank assembly (1) and tank skid
base (2). Attach eight lock washers (4)
and eight hexagon plain nuts (5).
Tighten.
2-141
TM 3-4230-209-30&P


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.