TM 5-3655-214-13&P
5-5. PUMP HEAD
This task covers:
a
Removal
b.
Disassembly
INITIAL SETUP
Equipment
Condition
Applicable Configurations
Para
Condition Description
All
Equipment is OFF
Test Equipment
None
Special Tools
Special Environmental Conditions
None
None
Materials/Parts
General Safety Instructions
None
Observe WARNINGS and
Caution
Personnel Required
MOS 52C
LOCATION/ITEM
ACTION
REMARKS
REMOVE
1.
a
Refer to Chapter four and remove pump
head.
DISASSEMBLY
2.
a
Refer to the illustration at the end of
this section, and remove two bushings
(1), and piston (2).
b.
Remove two screws (3), two lock-
washers (4), two flat washers (5) and
ring (6).
5-15