TM 5-3655-214-13&P
4-14. VALVES, LINES AND FITTINGS
This task covers:
a. Removal
d. Repair
a. Cleaning
e. Installation
c. Inspection
INITIAL SETUP
Equipment
Condition
Applicable Configurations
Para
Condition Description
All
Equipment is OFF
Test Equipment
None
Special Tools
Special Environmental Conditions
None
None
Materials/Parts
General Safety Instructions
Permacel Ribbon Thread
Observe Warnings and
Sealant No. 412 D or Teflon
Cautions
Tape (MIL SPEC T-27730)
Personnel Required
MOS 52C
LOCATION/ITEM
ACTION
REMARKS
REMOVAL
1.
WARNING
Make certain that pump has been shut down. Check that supply cylinder shutoff
valve is closed. Check that pressure has been relieved by opening the blow-off
valve and inlet bleed valve.
a. Refer to illustration at the end of this
section and remove valves lines and fit-
tings only to the extent required for
replacement of defective parts.