Install two channel clamping nuts (4) into each of the vertical frame mem-
Channel clamping nuts (4)
hers of the center frame support (5), only if removed. Position the two
Center frame support (5)
attach brackets (6) on vertical frame member. Aline holes to mate with
Attach brackets (6)
channel clamping nuts (4). Secure with four hexagon head cap screws (7).
Hexagon head cap
screws (7)
Pawl fastener (8)
Position pawl fastener (8) onto inside surface of tool box lid (9). Attach
knob (10) onto pawl fastener (8) and aline mounting holes. Insert two
Tool box lid (9)
machine screws (11) through tool box lid (9) and pawl fastener (8) and
Knob (10)
Machine screws (11)
secure with two hexagon self-locking nuts (12).
Hexagon self-locking
nuts (12)
Position pump frame support ( 13) between
Pump frame support (13)
the end of unit and aline holes. Secure with
Hexagon head cap
screws (14), flat washers (15), and hexagon
screws (14)
Flat washers (15)
Hexagon self-locking
nuts (16)
TM 3-4230-209-30&P
2-65