TM 10-5410-228-24
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools/Test Equipment:
Equipment Conditions:
Shop Equipment, Automotive Maintenance and
Equipment cables/hoses tagged, equipment removed
Materials/Parts:
NOTE
Note position and numbers for installation.
a. Removal
Remove seven screws (1), seven lockwashers (2) seven flat washers (3), three washers (4), and seven
shims (5) securing electrical equipment rack (6) to LMS. Discard lockwashers (2).
b. Installation
Secure electrical equipment rack (6) to LMS with seven screws (1), seven new lockwashers (2), seven
flat washers (3), three washers (4), and seven shims (5).
Figure 3-4. Electrical Equipment Rack Replacement