TM 10-5410-228-24
This task covers:
a. Removal
c. Assembly
b. Disassembly
d. Installation
INITIAL SETUP
Tools/Test Equipment:
Equipment Conditions:
Shop Equipment, Automotive Maintenance and
ABS inflated (reference TM 10-5410-228-10).
Materials/Parts:
NOTE
Remove/disassemble only to the extent necessary to remove or replace defective
assemblies/components. Use standard maintenance shop practices/procedures.
(1) Pull apart three quick disconnects (1, 2 and 3).
(2) Pull back folded over ends of two straps (4), disengaging fastener hook and fastener loop.
(3) Pull two straps (4) through two slots on mounting plate (5) and two loops (6) on ABS end wall.
(1)
Remove two screws (7), two flat washers (8) and two nuts (9) securing mounting bracket (10) to
mounting plate (5).
(2)
Cut electrical insulation sleeving and remove quick disconnect (2) from plastic tubing (11).
(3)
Cut electrical insulation sleeving and remove quick disconnect (1) from plastic tubing (12).
(4)
Cut electrical insulation sleeving and remove quick disconnect (3) from plastic tubing (13).
(5)
Remove plastic tubing (11) from tee union (14).
(6)
Remove plastic tubing (12) from female elbow (15).
(7)
Remove plastic tubing (13) from female elbow (15).
(8)
Remove two plastic tubings (16) from ends of tee union (14) and two female elbows (17).
(9) Unscrew two female elbows (17) from the back of two pressure gages (18).
(10) Remove four nuts (19) securing two brackets (20) to the back of two pressure gages (18).
(11) Remove two straps (4) from mounting bracket (10).
(12) Unscrew two female elbows (15) from the back of two pressure gages (18).
NOTE
Note alignment of pressure gage before removing.
(13) Remove two pressure gages (18) from mounting plate (5).
NOTE
Note alignment of pressure gage before installing.
(1)
Install two pressure gages (18) on mounting plate (5). Ensure two pressure gages (18) are
aligned properly as noted during removal.
Change 1