TM 10-5410-228-24
2.13.20 Converter Replacement Continued.
(3)
Connect 1A4W10 cable assembly connector P2 (10) to converter connector J1, located on back of
the unit.
(4)
Connect 1A4W9 cable assembly connector P2 (11) to converter connector J2, located on back of
the unit.
(5)
Push converter (9) back into rack, ensuring the alignment post on the rear of the unit is seating
properly.
(6)
Secure converter (9) to rack (5) with four screws (6), four new lockwashers (7) (Item 17, Appx E)
and four flat washers (8).
(7)
Secure guard (4) to side of rack (5) with eleven screws (1), eleven new lockwashers (2) (Item 17,
Appx E) and
eleven flat
washers (3).
1
2
3
4
9
10
16
87
6
5
11
15
14
12
13
(ROTATED 90)
56-1-M
Follow-on maintenance: Connect ECV battery ground cable per TM 9-2320-387-24-1, remove tags, apply
power and perform operational test.
2-212