• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INITIAL ADJUSTMENTS AND TESTS - Continued
INITIAL ADJUSTMENTS AND TESTS - Continued

Operator Manual Pesticide Dispersal Unit, Multicapability, Helicopter Slung
Page Navigation
  42    43    44    45    46  47  48    49    50    51    52  
img
. . .
TM 5-3740-218-13&P
Table 2-6. Flow Rate - Agrisect
Meter Setting
Flow Rate, Both Hoppers
(Lb/Min)
0
0
1
3
2
11
3
25
4
42
5
80
6
115
7
150
8
190
9
238
10
298
NOTE
Slinger assembly should be removed for this test (para 4-51).
(1) Set metering plate to desired opening by sliding forward or back.
(2) Ensure that hoppers are closed (cylinders fully extended).
(3) Connect hand control assembly to wiring harness.
(4) Place container under each hopper.
(5) On hand control, make sure SYSTEM switch is set to OFF and POWER switch is ON.
(6) Set key on engine to ON.
WARNING
Operator should be aware that foreign objects in slinger can cause injury when system is
activated.
(7) Start engine with ENGINE START switch.
2-33






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.