TM 5-3740-218-13&P4-10.PMCS TABLETable 4-1. Unit Level PMCSNOTE: Within designated interval, these checks are to be performed in the order listed.M-MonthlyS-SemiannuallyA-AnnuallyITEMNO.INTERVALITEM TO BEINSPECTEDPROCEDUREMSA1BatteryCheck for charge. Replace as necessary.Check terminals for corrosion. Clean as necessary.Check battery for cracks and leaks. Ensure cablesare tight. Tighten as necessary.Check battery box for damage.Check cables for damage. Replace as necessary.2BucketCheck all mounting hardware for looseness. Tightenas required. All locknuts may only be tightenedonce and are not to be reinstalled.3Hand ControlCheck harness connection nut at bottom of handcontrol for looseness. Tighten as required.Check heat shrink material for deterioration. Referto direct support maintenance.Check switch mounting nuts for tightness. Tightenas required.Check hand control for obvious damage. Replace asnecessary (para 4-38).Check indicators and switches for operation. Replacehand control (para 4-38).4Key SwitchboxCheck box for security in mounting. Tighten asrequired.Check for obvious external damage.Check fuse in key switch panel. If fuse is faulty,replace.5HydraulicCheck mounting hardware for security. Tighten asReservoir andrequired.Fuel TankCheck mounting tabs on frame for cracks atwelded seams and mounting holes for elongation.Refer to direct support maintenance.Check hydraulic reservoir sight gage for damage.Replace reservoir (para 4-34).Check fuel tank sediment bowl for damage. Replacebowl (para 4-28).4-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business