TM 5-3740-218-13&PParaPageRotary Atomizer Assembly Repair..............................................................................4-504-137Secondary Hydraulic Manifold Assembly Replacement ..............................................4-324-76Sling Hook Assembly Replacement............................................................................4-174-25Spark Plug Replacement............................................................................................4-254-54Special Instructions for Administrative Storage ..........................................................4-584-161Special Tools, TMDE, and Support Equipment...........................................................4-24-2Spray Nozzle Replacement/Repair.............................................................................4-474-128Tail Fin Replacement .................................................................................................4-164-24Troubleshooting Procedures.......................................................................................4-114-9ULV Boom Assembly Repair ......................................................................................4-494-134ULV Boom Assembly Replacement............................................................................4-484-130Unpacking..................................................................................................................4-44-2Section I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT,AND DIAGNOSTIC EQUIPMENT (TMDE); ANDSUPPORT EQUIPMENT4-1.COMMON TOOLS AND EQUIPMENTFor authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE) at yourunit.4-2.SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENTSpecial tools required for unit maintenance are listed in the Maintenance Allocation Chart (Appendix B) and the RepairParts and Special Tools List (Appendix F).4-3.REPAIR PARTSRepair parts for the Pesticide Dispersal Unit, Multicapability, Helicopter Slung (PDU) are listed and illustrated in theRepair Parts and Special Tools List (Appendix F).Section II. SERVICE UPON RECEIPT4-4.UNPACKINGThe PDU is shipped partially assembled in reusable shipping containers. Carefully remove the PDU and accessoriesfrom shipping containers and packing materials. Save shipping containers for storage and reshipment.4-5.CHECKING UNPACKED EQUIPMENTa. Inspect equipment for damage incurred during shipment. If equipment has been damaged, report damage on SF364, Report of Discrepancy.b. Check equipment against packing slip to see if shipment is complete. Report all discrepancies in accordance withinstructions in DA Pam 738-750.4-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business