TM 5-3740-218-13&P(2) Fill bucket assembly with pesticide. Use sight gages on side of tank.(3) Connect hand control assembly to wiring harness.(4) On hand control, make sure SYSTEM switch is set to OFF and POWER switch is ON. Make sure gate valveis open.(5) Set key on engine to ON.(6) Start engine with ENGINE START switch.(7) Set SYSTEM switch to ON. Check for hydraulic leaks, that EMPTY indicator is not lit, and that pressuregage on secondary hydraulic manifold assembly indicates 300 psi.WARNINGMake sure muffler and engine are cooled down before attempting assembly,disassembly, or adjustments. Hot muffler and engine components can cause burns.(8) If pressure is not 300 psi, loosen jam nut on secondary manifold pressure adjustment knob and adjust knob for desired pressure.(9) Tighten jam nut and repeat steps (7) and (8) until pressure is correct.CAUTIONDo not run system longer than three minutes after EMPTY indicator lights, or damage topump could occur.(10)When adjustment is complete, or if EMPT'Y indicator lights, set SYSTEM switch to OFF, POWER switchto OFF, and key on engine to OFF.(11)Remove fitting (1), pressure gage (4), and test tee (3). Install fitting (1) back into nozzle.c.LV System Operational Test. This test consists of verifying PDU function and final adjustment of application rate. Sample flow rates using water at ambient temperature of 70°F (21.1C) are given in table 2-5. Rates will vary with temperature, humidity, if chemicals are used, oil temperature, and other conditions.(1) Fill bucket assembly with pesticide. Use sight gages on side of tank.(2) Connect hand control assembly to wiring harness.2-29
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business