TM 5-3740-218-13&P2-10. INITIAL ADJUSTMENTS AND TESTSThe following paragraphs provide the initial adjustments and tests required before operating the PDU. Operatorprocedures consist of hydraulic system pressure and operational tests and pesticide application rate adjustments for eachoperating configuration.NOTESecondary hydraulic manifold should be adjusted to 300 psi in all modes of operation.a. LV System Boom Assembly Pressure Adjustment.WARNINGPersonnel handling solid or liquid pesticides shall use appropriate personal protectiveequipment consisting of respirators, coveralls, rubber gloves, goggles, etc., as requiredby type of pesticide used and in accordance with manufacturer's label directions. Avoiddirect contact with pesticide. Observe all warnings on label. Handle pesticide in well-ventilated area. Failure to do so could result in personal injury.NOTEAll initial tests should be performed with water only. All following tests for calibrationshould be performed with pesticide.(1)Remove center nozzle from left or right boom and install test tee, pressure gage, and nozzle.(2)Fill bucket with pesticide. Use sight gage on side of bucket.(3)Make sure gate valve on crosstube assembly is open.(4)Connect hand control assembly to wiring harness.(5)On hand control, make sure SYSTEM switch is set to OFF and POWER switch is ON.(6)Set key on engine to ON.(7)Start engine with ENGINE START switch.(8)Set SYSTEM switch to ON. Check for hydraulic leaks, that EMPTY indicator is not lit, and that pressuregage on primary hydraulic manifold assembly indicates 900-12900 psi.2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business