TM 5-3740-218-13&PTable 2-4. Operator Level PMCS (Cont)NOTE: Within designated interval, these checks are to be performed in the order listed.B-BeforeD-DuringA-AfterBDA••HydraulicCheck for proper hookup to pumpLeaks exceed Class II,Linesand primary manifold. Check foror lines installedleaks at manifold and rotaryincorrectly.atomizers.••RotaryCheck for secure mounting.Mounting is loose.AtomizersWARNINGOperator should be awarethat foreign objects inslinger can cause injurywhen system is activated.13••SD SystemCheck all L-clamps for tightness.Missing L-clampsChutesCheck for proper attachment ofcause leaks, or chutehydraulic lines. Check chutegates malfunction.gates for smooth operation andtight closure.••EmptyCheck empty sensor connectionLight on hand controlSensorand operation.unit inoperative.14••SD SystemCheck tightness of attachmentHardware missing orSlinger/hardware. Check for properslinger malfunctions.Hopperattachment of hydraulic lines.AssemblyCheck for proper activation byhand control. Check for foreignobjects in slinger.15••LiquidFlush entire system includingAll assemblies notSystembucket, crosstube and pumpproperly cleaned.assembly, booms, nozzles, liquidpesticide lines (ULV), and rotaryatomizers using appropriatesolvent.2-13INTERVALITEMNO.Item To BeInspectedEQUIPMENT IS NOTREADY/AVAILABLE IF:Procedures
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business