TM 5-3740-218-13&P
Table 2-4. Operator Level PMCS (Cont)
NOTE: Within designated interval, these checks are to be performed in the order listed.
B-Before
D-During
A-After
B
D
A
Sling Hook
Check for tightness of hardware
Essential hardware
Assembly
inside and outside of bucket.
missing.
Check hook for ease of swivel
action; if swivel action is not
smooth, lubricate.
Wiring
Check wiring harness for cut or
Insulation or wires
Harness
torn insulation, frayed or broken
damaged.
wires. Check harness mounting
clamps for security.
Sight Gages
Check sight gages for damage
Damaged or missing.
and security.
7
Lifting
Inspect for frays and cuts or
Strap frayed, cut, or
Strap
signs of weakness.
missing.
8
Hand
Check connections and
Damaged, or not
Control
quick-release coupling for proper
operating properly.
Harness
fit and operation. Check safety
Safety cable damaged
cable for damage and security.
or missing.
9
Primary
Check for leaks. Check hydraulic
Leaks exceed Class II.
and
lines for proper routing.
Secondary
Hydraulic
Manifolds
Pressure
Check gage pressure (should read
Pressure not
Gage
900-1200 psi); adjust if necessary.
attainable.
(Primary
Manifold)
Pressure
Check gage pressure (should read
Pressure not
Gage
300 psi in all modes); adjust if
attainable.
(Secondary
necessary.
Manifold)
10
Liquid
Check all L-clamps for tightness.
Leaks exceed Class II.
System
Check for cracked or broken ears
Pump and
on mounting plates. Check for
Crosstube
leaks anywhere in system.
Assembly
2-11
INTERVAL
ITEM
NO.
Item To Be
Inspected
EQUIPMENT IS NOT
READY/AVAILABLE IF:
Procedures