TM 5-3740-218-13&PTable 2-4. Operator Level PMCS (Cont)NOTE: Within designated interval, these checks are to be performed in the order listed.B-BeforeD-DuringA-AfterBDA••StrainerCheck for cleanliness; clean withStrainer plugged.water or appropriate solvent.••Pump andCheck hydraulic couplings forFails to operate.Crosstubecorrect location and secureness ofSprayhookup. Check operation withSystemhand control.ControlValve••LevelCheck connections. Check forFails to operate.Sensorsproper operation (indicator lightswhen bucket is empty).11•LV BoomsCheck for proper assembly. MakeCannot be secured.and Strutssure all quick-release pins aresecured.••BoomCheck for missing or compressedMissing, or leaksKamlockgaskets. Check for leaks.exceed Class II.Gaskets••SprayCheck for leaks using water.Leaks exceed Class II,NozzlesCheck for correct/uniform sprayor spray producespattern. If threads are strippedexcessively largeor body cracked, refer to unitdroplets.maintenance.12••ULV BoomCheck for secure attachment,Not secured, or broken.broken, or missing parts.Quick-release pins should be fullyengaged.••BoomCheck for missing or compressedMissing, or leaksKamlockgaskets. Check for leaks.exceed Class II.Gaskets••LiquidCheck for leaks at all connections.Leaks exceed Class II.PesticideLines••NozzlesCheck for leaks using water.Leaks exceed Class II.2-12INTERVALITEMNO.Item To BeInspectedEQUIPMENT IS NOTREADY/AVAILABLE IF:Procedures
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business