TM 5-3740-218-13&P
4-10.
PMCS TABLE
Table 4-1. Unit Level PMCS (Cont)
NOTE: Within designated interval, these checks are to be performed in the order listed.
M-Monthly
S-Semiannually
A-Annually
ITEM
INTERVAL
ITEM TO BE
NO.
INSPECTED
PROCEDURE
MS
A
6
Primary Hydraulic
Check manifold for Class III hydraulic leaks at fittings.
Manifold
Check manifold for security in mounting. Tighten as
required.
Check liquid-filled pressure gage for leaks. Replace as
7
Secondary
Check manifold for Class III hydraulic leaks at fittings.
Hydraulic Manifold
Check manifold for security in mounting. Tighten as
required.
Check liquid-filled pressure gage for leaks. Replace as
8
Hydraulic Lines
Check all hydraulic lines to ensure fittings are tight and
not leaking. Tighten as required.
Check for severely chafed or rubbed spots that would lead
9
Engine
Check engine for security in mounting to frame. Tighten
as required.
Check cooling fins for cracks or breaks.
Check air cleaner for security and damage. Tighten or
replace as necessary.
Check hydraulic pump for Class III leaks and mounting
bolts for tightness. Replace pump (para 4-27) and tighten
bolts and hoses.
Check for obvious external damage.
Check all engine-mounted accessories and components
for security and obvious damage. Tighten or replace as
required.
Check engine oil level. Fill as required.
10
Starter Motor
Check starter motor mounting bolts for tightness. Tighten
as required.
Check electrical lead attach points for tightness. Tighten
as required.
11
Carburetor
Check hoses and gaskets for leaks. Replace as necessary.
Check for free movement of choke assembly and linkage.
4-5