• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL OPERATING PROCEDURES
GENERAL OPERATING PROCEDURES - Continued

Recharging Unit, Carbon Dioxide Reciprocating Pump, Electric Motor Driven, Ac, 115Volt Single Phase, 60 Hz, 1Hp, 12681, 12681-2
Page Navigation
  8    9    10    11    12  13  14    15    16    17    18  
img
TM5-3655-214-13&P
2-6. GENERAL OPERATING PROCEDURES -Continued.
(1)
Check that discharge shutoff valve is closed
(fully clockwise).
(2)
Open supply cylinder shutoff valve.
(3)
Place container below outlet of inlet bleed valve.
WARNING
Use care to protect your flesh from
contact with Carbon Dioxide (C02).  It
produces an effect similar to a scald or
burn.  Stay clear of the inlet bleed
valve's outlet port.
(4)
Slowly open (crack) inlet bleed valve and
observe that carbon dioxide is flowing freely.
(5)
Close inlet bleed valve.
(6)
Open discharge shutoff valve.
WARNING
In the event of any malfunction press
STOP pushbutton and close supply
cylinder shutoff valve.
(7)
Press START pushbutton.
2-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.