Refractory box (17)
If necessary, remove refractory box (17) and check for leaks in the com-
bustion chamber area and return tubes.
Mark any leak as it is found.
Boiler Assembly/
Remove pressure and make repairs.
Retest after making repairs. Release pressure.
2-241
TM 3-4230-209-30&P