• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOW PRESSURE HEATING BOILER ASSEMBLY.
LOW PRESSURE HEATING BOILER ASSEMBLY. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  227    228    229    230    231  232  233    234    235    236    237  
img
TM 3-4230-209-30&P
2-226
2-53. LOW PRESSURE HEATING BOILER ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Low Pressure Heating
Boiler Assembly/
Remove ignition-combustor cable assembly (6) and nonmetallic
Ignition-combustor cable
grommet (7).
assembly (6)
Nonmetallic grommet (7)
Machine bolts (8)
Internal tooth lock
washers (9)
When handling asbestos material, always wear an air
Combustor assembly (10)
filtering respirator, gloves, and goggles. Wash face and
hands with soap and water before eating or smoking.
Asbestos can cause cancer if handled without protection.
Unscrew and remove eight machine bolts (8) and internal tooth lock
washers (9). Slide out combustor assembly (10).
Remove gasket (11), combustor blower shroud (1 2), and gasket (1 3).
Gasket (11)
Combustor blower
shroud (12)
Gasket (13)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.