• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PURGE AND BYPASS RETURN LINE.
LOW PRESSURE HEATING BOILER ASSEMBLY. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  226    227    228    229    230  231  232    233    234    235    236  
img
. . . . .
2-53. LOW PRESSURE HEATING BOILER ASSEMBLY.
This task covers:
c. Reassembly
a. Disassembly
d. Test
b. Repair
INITITAL SETUP
Equipment Condition
Tools and Special Tools
Unit maintenance authorized components are removed in
Automotive Maintenance and Repair Field Maintenance
TM 3-4230-209-20&P and are not covered in this manual.
Shop Equipment, Basic, Less Power (SC 4910-95-CL-A31)
Special Safety Instructions
Test Equipment
M5 Test Set
WARNING
Materials/Parts
When handling asbestos material, always wear an air filtering
Antiseizing tape (item 38, app C)
respirator, gloves, and goggles. Wash face and hands with soap
Fire box gasket (fig D-20)
and water before eating or smoking. Asbestos can cause cancer
Side fire box gasket (fig D-4)
if handled without protection.
References
TM 3-1040-251-15
TM 3-4230-209-20&P
REMARKS
ACTION
LOCATION/lTEM
Low Pressure Heating
Boiler Assembly/
Electrical lead (1)
Combustion motor
mounting assembly (2)
Hexagon head cap
screws (3)
Internal tooth lock
washers (4)
Gasket (5)
TM 3-4230-209-30&P
2-225


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.