NOTE
Two long mounting stiffeners will be used with Marlow
pumps. Four short mounting stiffeners will be used with
Ohler pumps.
Machine mounting pad (44)
Place four machine mounting pads (44) around the four holes on the skid.
Plumbing assembly (45)
Position plumbing assembly (45) onto machine mounting pads (44).
Mounting stiffener (46)
Select proper style of mounting stiffeners (46) for type of pump used.
Hexagon head cap
Install mounting stiffeners (46). Two long stiffeners for Marlow pumps or
screw (47)
four short stiffeners for Ohler. Install four hexagon head cap screws (47)
to secure plumbing assembly (45).
Pipe elbow (48)
Wrap male threads of pipe elbow (48) and
Pipe nipple (49)
pipe nipple (49) with antiseizing tape or coat
the threads with sealing compound.
2-87
TM 3-4230-209-30&P