• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SKID BASE SUBASSEMBLY. - Continued
SKID BASE SUBASSEMBLY. - Continued

Technical Manual For Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  87    88    89    90    91  92  93    94    95    96    97  
img
TM 3-4230-209-30&P
2-86
2-20. SKID BASE SUBASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/ITEM
Skid Base Subassembly
Install gasket (35), pipe straight adapter (36), pipe coupling (37), stop-
Gasket (35)
check valve (38), and pipe nipple (39). Make certain stop-check valve (37)
Pipe straight adapter (36)
is in closed position before servicing with oil. (Refer to
Pipe coupling (37)
TM 5-2805-259-14).
Stop-check valve (38)
Pipe nipple (39)
Wrap male threads of pipe elbow (40) and nipple (41) with antiseizing tape
Pipe elbow (40)
or coat threads with sealing compound.
Nipple (41)
Pipe elbow (42)
Install pipe elbow (40), nipple (41), and pipe elbow (42).
Install engine cover (43).
Engine cover (43)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.