Pump Unit Subassembly/
Frame assembly (1)
With one soldier at each corner, lift frame assembly (1) up over the skid
After frame assembly (1) is positioned on skid base
Skid base subassembly (2)
base subassembly (2) and lower into place. Position to aline as many
subassembly (2), refer to plumbing assembly
Spring lock washers (3)
mounting holes as possible. Install ten spring lock washers (3) and
Hexagon head cap
hexagon head cap screws (4) fingertight. Install two spring lock
screws (4)
washers (3) and hexagon head cap screws (5).
Hexagon head cap
screws (5)
2-51
TM 3-4230-209-30&P