TM 10-5410-228-10
3.13.2 ABS Line Replacement.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools/Test Equipment:
Equipment Conditions:
ABS Repair Kit (Item 6, Appendix B, Section II)
ABS deployed, inflated or deflated.
Materials/Parts:
Spare Parts Kit (Item 38, Appendix B, Section II)
a. Removal (Refer to Figure 3-10)
(1)
Untie or cut ABS line (1) from Dee Ring (2) on ABS (3).
(2)
Pull ABS line (1) through holes on line slip (4). Discard ABS line (1).
b. Installation (Refer to Figure 3-10)
(1)
Cut new ABS line (1) to proper length.
(2)
Thread working end (5) of ABS line (1) through holes on line slip (4).
NOTE
ABS line is secured to line slip with figure eight knot.
(3)
Hold working end (5) of ABS line (1) in one hand.
(4)
Make crossing turn (6), bringing working end (5) of ABS line (1) over standing part (7).
(5)
Take working end (5) behind standing part (7).
(6)
Bring working end (5) to front of knot.
(7)
Pass working end (5) through crossing turn (6). Pull tight.
(8)
Thread other working end (8) of ABS line (1) through Dee Ring (2) on ABS (3).
(9)
Pull approximately one and one half feet through Dee Ring (2).
NOTE
ABS line is secured to Dee Ring with bowline knot.
(10) Make crossing turn (9), bringing working end (8) of ABS line (1) over standing part (10). Hold
crossing turn (9) in place with one hand.
(11) Pass working end (8) through back of crossing turn (9). Leave loop (11) in working end (8) to
form final loop (11) of knot.
(12) Take working end (8) behind standing part (10).
(13) Pass working end (8) up through front of crossing turn (9).
(14) Pull on standing part (10) and on doubled working end (8) to tighten knot.
3-61