2.18.3 Fuseholder.
a. Removal (Refer to Figure 2-74)
(1)
Remove molded male (1) and female (2) end caps from luminaire (3).
(2)
Disconnect lampholder (4) by pressing retainer (5).
(3)
Pull lens/screen assembly (6) off the extrusion assembly (7) to expose ballast (8).
(4)
Remove (cut) insulation sleeving (9) from rear of fuseholder (10) and remove wires from
fuseholder terminals.
(5)
Unscrew fuseholder cap (11) and remove fuseholder (10) from switch bracket (12).
b. Installation (Refer to Figure 2-74)
(1)
Place new fuseholder (10) into position through switch bracket (12).
(2)
Connect wires to fuseholder (10) terminals and install insulation sleeving (9) around terminals.
(3)
Install cap (11) over fuseholder (10). (Install new fuse if necessary.)
(4)
Slide extrusion assembly (7) into lens/screen assembly (6).
(5)
Install lampholder (4).
(6)
Install male (1) and female (2) molded end caps on luminaire (3).
c.
Test (Refer to Figure 2-72)
(1)
Refer to paragraph 2.18.1a., steps 1 through 3, to partially disassemble luminaire.
(2)
Test for continuity at the fuseholder connection wires (with fuse in place).
(3)
If continuity does not exist, replace fuseholder.
Figure 2-74. Fuseholder Removal and Installation
2-335






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.