• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Ballast Assembly Continued.
Figure 2-73. Switch Removal and Installation

TM-10-5410-228-24 Chemical Biologiocal Protective Shelter (CBPS) System NSN 5410-01-441-8054 (Green) (EIC:5ZT) NSN 5410-01-482-4633 (Tan) Manual
Page Navigation
  391    392    393    394    395  396  397    398    399    400    401  
TM 10-5410-228-24
Figure 2-72. Ballast Assembly, Fuseholder and Switch Test
2.18.2 Switch.
a. Removal (Refer to Figure 2-73)
(1)
Remove fuse cap and fuse.
(2)
Remove molded male (1) and female (2) end caps from luminaire (3).
(3)
Disconnect lampholder (4) by pressing retainer (5).
(4)
Pull lens/screen assembly (6) off the extrusion assembly (7) to expose ballast (8).
(5)
Separate bracket (9) from male end cap (1).
(6)
Remove ring terminals (10) from rear of switch (11).
(7)
Unscrew switch seal (12) and remove switch (11) and paper insulation (13) from rear of bracket
(9).
2-333






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.