TM 5-3740-218-13&P
This task covers:
Disassembly
Assembly
A.
INITIAL SETUP
Tools and Special Equipment:
Equipment Condition:
Tool Kit, 5180-00-177-7033
Reference
Condition Description
ULV Boom Assembly
Removed
B.
DISASSEMBLY
(1)
Disconnect hydraulic hoses (1 and 2) from two rotary atomizer assemblies (3).
(2)
Disconnect two push-on hoses (4) from two tee-jet diaphragms (5).
(3)
Remove two fittings (6) from two push-on hoses (4).
(4)
Remove two cap assemblies (7) and two clamps (8) from two push-on hoses (4).
(5)
Pull two push-on hoses (4) through boom (9).
(6)
Remove two tee-jet diaphragms (5), two orifice discs (10), two hex nipples (11), and two adapters (12) from
top of two rotary atomizer assemblies (3).
(7)
Remove two rotary atomizer assemblies (3) by removing four clamps (13).
(8)
Remove two hydraulic couplers (14) and two dust caps (15) from hydraulic hoses (1 and 2) at opposite end.
(9)
Remove two quick-release pins (16) and two cable assembies (17) by removing two screws (18).
l