TM 5-3740-218-13&P
BUCKET HARNESS REPLACEMENT (CONT)
C.
INSTALLATION
(1) Connect ground on housing (1).
(2) Connect rectifier assembly connectors J2 (2).
(3) Connect oil level switch connectors J1 (3).
(4) Connect female piggyback disconnect (4) to starter.
(5) Connect key Switchbox (white wire) connectors B2 (5).
(6) Connect rectifier assembly (white wire) connectors B1 (6).
(7) Connect key Switchbox (black and red wire) connectors A1 (7).
(8) Connect CDI ignition coil connectors A2 (8) leading to CDI spark plug.
(9) Connect female connector (9) to secondary manifold.
(10) Connect female connector (10) to primary manifold.
(11) Connect empty sensor 3-pole connector (11) and ground connection (12).
(12) Align bucket harness on bucket weldment and secure with four cable ties (13) and three clamps (14).
(13) Route bucket harness under bucket lip until tail fin is reached.
(14) Align four cushion clamps (15) on tail fin bracket and under bucket lid lip and secure with four screws (16),
eight washers (17), and four nuts (18).
4-96