• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INITIAL ADJUSTMENTS AND TESTS
Figure 2-10. ULV Boom Pressure Adjustment

Operator Manual Pesticide Dispersal Unit, Multicapability, Helicopter Slung
Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
img
. .
TM 5-3740-218-13&P
WARNING
Make sure muffler and engine are cooled down before attempting assembly,
disassembly, or adjustments. Hot muffler and engine components can cause burns.
(9) If pressure is now between 900-1200 psi, loosen jam nut (1) on primary manifold pressure adjustment knob
(2), shown in figure 2-9, and adjust knob for desired boom pressure.
Figure 2-9. LV Boom Pressure Assembly Adjustment
NOTE
Turning knob clockwise decreases pressure; counterclockwise increases pressure.
(10) Tighten jam nut (1) and repeat steps (8) and (9) until pressure is correct.
CAUTION
Do not run system longer than 3 minutes after EMPTY indicator lights, or damage to pump could occur.
(11) When adjustment is complete, or if EMPTY indicator lights, set SYSTEM switch to OFF, POWER switch to
OFF, and key on engine to OFF.
2-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.