• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Continued
Section V. ORGANIZATIONAL MAINTENANCE TROUBLESHOOTING

Recharging Unit, Carbon Dioxide Reciprocating Pump, Electric Motor Driven, Ac, 115Volt Single Phase, 60 Hz, 1Hp, 12681, 12681-2
Page Navigation
  22    23    24    25    26  27  28    29    30    31    32  
img
TM 5-3655-214-13&P
4-5. PREVENTATIVE MAINTENANCE CHECKS AND SERVICES - Continued
Organizational Preventative Maintenance Checks and Services
NOTE Within designated interval, these checks are to be performed in the order listed.
W - Weekly
Q - Quarterly
H - Hours
M - Monthly
S - Semiannually
Item
Interval
Item to be
Procedures
No.
W
M
Q
S
H
Inspected
1
Mounting
Inspect for missing
hardware
mounting hardware.
Replace all missing
mounting hardware.
2
Hoses
Inspect hoses for defects.
Replace defective hoses.
3
Motor
Add from 30 to 40 drops
of SAE 10 motor oil each
1500 hours of operation.
Inspect motor for
evidence of overheating
(discoloration) or noisy
operation. Replace defec-
tive motor.
4
V-Belt
Inspect for defects.
Replace defective belt.
5
Electric
Inspect cable and connec-
cable
tor for damage. Replace
defective cable or con-
nector
6
Safety
Inspect chain for defects.
Chain
Replace defective chain.
7
Valves
Operate valves for ease of
operation and defects.
Replace defective valves.
4-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.