TM 3-4230-209-30&P
2-206
2-45. SKID ASSEMBLY (CONT).
REMARKS
LOCATION/lTEM
ACTION
Skid Assembly/
Wrap antiseizing tape around external pipe threads on pipe-to-tube
Pipe-to-tube elbow (12)
elbow (12), pipe-to-tube straight adapter (14), pipe-to-tube elbow (15),
Fuel pump assembly (13)
pipe-to-tube straight adapter (16), and pipe to-tube tee (17).
Pipe-to-tube straight
adapter (14)
Install pipe-to-tube elbow (12) into side of fuel pump assembly (13), and
Pipe-to-tube elbow (15)
point open end straight back toward solenoid valve (1). Install pipe-to-
Pipe-to-tube straight
tube straight adapter (14) into bottom front of fuel pump assembly (13).
adapter (16)
Pipe-to-tube tee (17)
Screw pipe-to-tube elbow (15) into side of fuel pump assembly (13).
Position the open end pointing downward.
Install pipe-to-tube straight adapter (16) into lower part of solenoid
valve (1), and pipe-to-tube tee (17) into part on the top of solenoid
valve (1). Position open end of pipe-to-tube tee (17) so it alines with skid
base edges.